My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150159 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150159 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:16:06 AM
Creation date
3/26/2007 10:42:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150159
CT2017-1209
Contractor Name
Orphan Wells of Wiggins, LLC
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100 %) interest in the following property all located within Township 4 <br />North, Range 60 West, 6t' P.M., Morgan County Colorado: well site location for <br />Borrower's Well No. 3, (within NE /4 Section 34), pipeline easement (within Sections 16, <br />21, 22, 27, and 34), and well site for Borrower's Well No. 1 (within NW /4 NE /4 Section <br />16), as more particularly described in the attached Deed of Trust ( "Collateral "). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional conditions or requirements <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER's and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the. award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment- bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre - construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications. <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as -built <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.