My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150159 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150159 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:16:06 AM
Creation date
3/26/2007 10:42:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150159
CT2017-1209
Contractor Name
Orphan Wells of Wiggins, LLC
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary Orphan Wells of Wiggins — Contract No. C150159 <br />SECTION 1 - BORROWER INFORMATION <br />Name: Orphan Wells of Wiggins, L.L.C. <br />Address: 18874 County Road 4, Wiggins, CO 80654 <br />Federal Identification No.: 20- 0235438 <br />Contact: Steve Bruntz, President <br />Phone Number: 970 - 483 -7838 Fax Number: 970 -483 -6304 <br />E -mail address: wigginswap @aol.com <br />Type of Entity: Colorado limited liability company <br />Section 2 — Project Description <br />Description of PROJECT: The BORROWER is a company comprised of 31 separate <br />agricultural operators that own 45 wells and irrigate 4,500 acres. The BORROWER <br />applied to the CWCB for a loan to be used for the construction of a well augmentation <br />and groundwater recharge project consisting of one recharge well, one augmentation <br />well, a pipeline and 23 recharge ponds, located in Morgan County, hereinafter <br />referred to as the PROJECT, at an estimated total cost of $1,037,700. <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report on <br />the PROJECT sponsored by the BORROWER, entitles "Feasibility of Construction of the <br />Orphan Wells of Wiggins Augmentation Project," dated October 2003 which is <br />incorporated herein by reference, and, based upon the feasibility report, the CWCB <br />determined the PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB'S AUTHORITY <br />Small Proiect Loan: This loan is made pursuant to the provisions of §§ 37 -60 -119 and <br />37 -60 -120, C.R.S., which authorizes the CWCB to loan money for water projects for the <br />benefit of the people of the State, provided that the borrower assures repayment of that <br />money. <br />Section 37- 60- 122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br />SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br />At its November 2003 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $1,037,700 for PROJECT costs plus <br />$10,377 for the 1% loan service charge for a total loan amount of $1,048,077, with <br />repayment terms of 2.50% per annum for 30 years. <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br />No existing debt <br />Appendix 1 to Loan Contract C150159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.