My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150168 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150168 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 12:24:01 PM
Creation date
3/26/2007 10:41:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150168
Contractor Name
Fulton Irrigation Ditch Company
Contract Type
Loan
Water District
1
County
Adams
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />hundred percent (100%) interest in diversion structure located on the South Platte River <br />at approximately 100th Avenue, as more particularly described in the attached Deed of <br />Trust ("Collateral"). <br /> <br />SECTION 7 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> <br />The CWCB acknowledges that, pursuant to its approval of the loan wherein loan <br />proceeds may be used to repay PROJECT costs already incurred, (1) the BORROWER <br />has completed all or part of the PROJECT, and (2) all phases of the PROJECT has been <br />completed in accordance with CWCB Construction Fund Program Procedures, as <br />listed in Section 8 below. <br /> <br />SECTION 8 - CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br /> <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br /> <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />937-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br /> <br />D, CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br /> <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br /> <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br /> <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br /> <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br /> <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications. <br /> <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by 9 37-87-105, C.R.S., <br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.