My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150168 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150168 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 12:24:01 PM
Creation date
3/26/2007 10:41:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150168
Contractor Name
Fulton Irrigation Ditch Company
Contract Type
Loan
Water District
1
County
Adams
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Summary - Fulton Irrigating Ditch Co. - Contract No. C150168 <br /> <br />SECTION 1 -BORROWER INFORMATION <br /> <br />Name: The Fulton Irrigating Ditch Company <br /> <br />Address: 25 South 4th Avenue, Brighton, CO 80601 <br /> <br />Federal Identification No.: <br /> <br />Contact: Brice Steele, Secretary <br /> <br />Phone Number: 303-659-3171 Fax Number: 303-659-5053 <br /> <br />E-mail address:brice@steelepc.com <br /> <br />Type of Entity: a Colorado mutual ditch company nonprofit corporation <br />Section 2 - Project Description <br /> <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used for the rehabilitation of the BORROWER'S diversion structure located on the <br />South Platte River at approximately 100th Avenue, located in Adams County, <br />hereinafter referred to as the PROJECT, at an estimated total cost of $201 ,000. <br /> <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Fulton Irrigating and Ditch Company South Platte River <br />Diversion Hydraulic Cutoff," dated January 2004, prepared by Tetra Tech RMC, <br />which is incorporated herein by reference, and, based upon the feasibility report, the <br />CWCB determined the PROJECT to be technically and financially feasible. <br /> <br />SECTION 3 - CWCB'SAUTHORITY <br /> <br />Small Proiect Loan: This loan is made pursuant to the provisions of 9937-60-119 and <br />37-60-120, C.R.S., which authorizes the CWCB to loan money for water projects for the <br />benefit of the people of the State, provided that the borrower assures repayment of that <br />money. <br /> <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br /> <br />SECTION 4 - BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its March 2004 meeting, the CWCB approved a Small Project Loan from the Severance <br />Tax Trust Fund Perpetual Base Account to the BORROWER in an amount up to $170,000 for <br />PROJECT costs plus $1,700 for the 1 % loan service charge for a total loan amount of <br />$171,700, with repayment terms 20 years at 2.80% per annum (a blended interest rate <br />based on the composition of the BORROWER'S shareholders as follows: 68% agricultural, <br />26% municipal and 6% commercial). <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />No existing secured debt <br /> <br />SECTION 6 - COLLATERAL <br /> <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br /> <br /> <br />Appendix 1 to Loan Contract C150168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.