Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />6. Liability Insurance During Construction. The BORROWER shall require the <br />Construction Firm and its subcontractors to maintain, during the term of their contracts for <br />construction of the PROJECT, insurance with a company that is satisfactory to the CWCB, <br />in the limits shown below. No payments shall be made to the BORROWER unless all proof <br />of insurance is current. The BORROWER shall file notices of renewals of said policies with <br />the CWCB as renewals occur. <br /> <br />a. Worker's compensation and employer's liability insurance in the required statutory <br />amounts. <br /> <br />b. Automobile liability insurance that includes coverage for all owned, non-owned and <br />hired vehicles with minimum limits of $1 ,000,000 combined single limit for bodily injury <br />and property damage. <br /> <br />c. Commercial general liability insurance with minimum limits of $1,000,000 combined <br />single limit for each occurrence and $2,000,000 general aggregate. This insurance <br />coverage shall include products/completed operations and ~ersonal injury. <br /> <br />d. Builder's risk insurance for construction in progress for all perils of loss including fire, <br />wind, hail, vandalism, and flood in an amount equal to the completed value of the <br />PROJECT. <br /> <br />During the time of construction, the CWCB reserves the right to increase the above <br />amount of insurance so that said amounts at a minimum correspond to the amount <br />established by the Colorado Governmental Immunity Act, now and as hereafter <br />amended. <br /> <br />7. Progress Reports. The BORRO\^JER shall prepare a periodic progress report 'vvhich <br />contains a statement of the PROJECT tasks completed and the costs expended for that <br />period and shall forward said statement to the CWCB. <br /> <br />C. GENERAL PROVISIONS <br /> <br />1. Periodic Inspections. Throughout the term of this contract, the BORROWER shall permit <br />a designated representative of the CWCB to make periodic inspections of the PROJECT. <br />Such inspections are solely for the purpose of verifying compliance with the terms and <br />conditions of this contract. Furthermore, such inspections shall cover the condition of the <br />PROJECT, operating records, maintenance records, and financial records, and shall not be <br />construed nor interpreted as an approval of the actual design and/or construction of any <br />element of the PROJECT facilities. <br /> <br />2. Adhere To Applicable Laws. The BORROWER shall strictly adhere to all applicable <br />federal, state, and local laws and regulations that are in effect or may hereafter be <br />established throughout the term of this contract. <br /> <br />3. Designated Agent Of The CWCS. The CWCB's agents and employees are hereby <br />designated as the agents of the CWCB for the purpose of this contract. <br /> <br />4, Contract Is Not Assignable. The BORROWER may not assign this contract except with <br />the prior written approval of the CWCB. <br /> <br />Page 8 of 13 <br /> <br />Loan Contract <br />