My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:21 AM
Creation date
3/26/2007 10:37:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150067
Contractor Name
Lower South Platte Water Conservancy District
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, and, if required by S 37-87-105, C.R.S., <br />the BORROWER shall provide the same drawings to the State Engineer's Office for <br />approval and filing. <br /> <br />k. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT. <br /> <br />2. Eligible Expenses. Listed below are the project expenses for which the Borrower is <br />eligible for reimbursement: <br /> <br />a. Preparing final designs and specifications for the PROJECT. <br /> <br />b. Preparing bid and construction contract documents. <br /> <br />c. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />d. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br /> <br />e. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br /> <br />f. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB, the BORROWER, the CONSULTANT and the CONSTRUCTION <br />FIRM. <br /> <br />g. Engineering services for construction management, including design and construction <br />management for CWeS-approved change orders. <br /> <br />h. Legal services for reviewing engineering services contracts, reviewing this contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br /> <br />3. Loan Disbursements. The BORROWER shall provide to the CWCB a report prior to each loan <br />disbursement that states the PROJECT tasks completed and the costs expended for that period. <br />The CWCB shall disburse loan funds in accordance with the Disbursement Schedule (Section 4) <br />of the Project Summary. <br /> <br />4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />complete the PROJECT within the time specified in the Time for Performance (Section 5) <br />of the Project Summary. <br /> <br />5. Indemnification By The Construction Firm. The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the CWCB and the BORROWER <br />against all liability and loss, and against all claims and actions based upon or arising out <br />of damage or injury, including death, to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PROJECT or by conditions created thereby, or based upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br /> <br />Page 7 of 13 <br /> <br />Loan Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.