My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000396
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:50:30 AM
Creation date
3/26/2007 10:36:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150005
Contractor Name
Loveland, City of
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />, <br /> <br />..' <br /> <br />Mr. Larry Howard,P.E. <br />October 21, 1997 <br /> <br />10. The evaluation factors listed on page 5-10 do not correspond to the evaluation factors <br />listed on page 15 of the 7/1/97 Scope of Work. In addition, there is no way to <br />determine how the alternatives were evaluated, or how comprehensive the evaluation <br />actually was, from the information given in Section 5. The evaluation lacks both <br />detail as well as any kind of summary tabulation to allow the reader to compare one <br />alternative against the other and arrive at any sort of conclusion. <br /> <br />11. From our conversation, it's my understanding that one of the alternatives in Section 6 <br />was not selected by the City. This section of the report also has problems with <br />drawings not available or not in synch with the text. <br /> <br />12. The Financial Program in Section 7 should specify: the total.amount needed from all <br />sources for the selected project; a description of proposed financing arrangements or <br />various financing scenarios to provide the needed funds; and a detailed analysis of <br />revenues and expenditures for the entire period of debt retirement. If sources of <br />financing other than a Construction Fund loan are proposed, these sources should be <br />described along with expected financing rates and terms. The schedule of revenues <br />and expenditures should then show each major category of revenues or costs to <br />include debt service on the Construction Fund loan as well as loans or bonds obtained <br />from other sources. Enclosed is an example of a revenue/expenditure schedule. Also, I <br />was unable to find the City's current rate schedule in the report. <br /> <br />13. As I mentioned in our conversation, the City may want to consider several <br />Construction Fund financing scenarios. <br /> <br />I would be happy to meet with you and/or Woodward-Clyde to discuss these comments. <br /> <br />Sincerely, <br /> <br />~ /3~~ <br /> <br />William E. Green, P .E. <br />Manager of Planning <br />Project Planning and Construction <br /> <br />cc: Bill Stanton <br />Sal Todaro, Woodward-Clyde <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.