Laserfiche WebLink
<br />...~-.- <br />J.--' , <br /> <br />. <br /> <br />Alternate "I" Hauling Treated Water from Off-Site Sources --16 <br /> <br />2) Non-Construction and Other Proiects- <br /> <br />-------- 26 <br /> <br />3) Annual Operation and Maintenance---------------------~-27 <br /> <br />4) Present Worth. Based on Federal Discount Rates-----28 <br /> <br />.; <br /> <br />H) Advantae.esl Disadvantae.es-----------------------------29 <br /> <br />PROPOSED PROJECT (RECOMMENDED ALTERNATIVE) <br />******************************************************* -31 <br /> <br />A) Proiect Desi2n-- -~ --------------- ~--~~~ -------31 <br /> <br />1) Water Supply~ L. --- -----31 <br /> <br />2) Treatment------------------ -----31 <br /> <br />. <br /> <br />3) Treated Water Storage <br /> <br />---------32 <br /> <br />4) Pumping Stations---------- -. ------------------ -32 <br /> <br />5) Raw Water Fill and Draw Transmission System-------- 33 <br /> <br />6) Surge Tank------: ..-----------------------------33 <br /> <br />7) Raw Water Storage-- ~L____~ <br /> <br />---34 <br /> <br />8) Hydraulic Calculations--------------------------------34 <br /> <br />B) Cost Estimate---- nu ~ <br /> <br />--- 35 <br /> <br />C) AnnualOperatine. Bude.et------------------------------36 <br /> <br />1) Income------------------ <br /> <br />---36 <br /> <br />. <br /> <br />2) Operations and Maintenance Costs-----------------.:.------36 <br />