Laserfiche WebLink
<br />:. <br /> <br />(G) Cost Estimates --- <br /> <br />20 <br /> <br />1) Construction <br /> <br />Alternate "A" Enlarge Crescent Lake, Install New Raw Water <br />Transmission Line, and Upgrade Existing Water ',freatment Plant <br /> <br />------~ ~ - ~ -----------20 <br /> <br />Alternate "B" Enlarge Crescent Lake and Build New Water <br />Treatment Plant- 20 <br /> <br />Alternate "C" Construct a Reservoir in Maure Hollow and Upgrade <br />the Existing Water Treatment Plant------- ---------------- 21 <br /> <br />a) Using Imported Material-- <br /> <br />21 <br /> <br />b) Using On-Site Material---------------~21 <br /> <br />Alternate "D-2"-Crow Lane Reservoirs--- <br /> <br />.-22 <br /> <br />i <br /> <br />a) Crow Lane #1-20' High Dam------ . ------------22 <br /> <br />b) Crow Lane # 1-35' High Dam <br /> <br />23 <br /> <br />c) Crow Lane # 2-20' High Dam----------------------------24 <br /> <br />d) Crow Lane #2-35' High Dam----- <br /> <br />25 <br /> <br />Alternate "E" Additional Wells M~nirolded Together--------- <br />( not included-not economically feasible )---------~--~25 <br /> <br />Alternate "F" Storage at Buttonrock Reservoir and Upgraded Water <br />Treatment Plant ( not included-not available to the District)--25 <br /> <br />Alternate "G" Storage at Lake Estes and Transmission to Upgraded <br />Water Treatment Plant- ------~ ~---- ----26 <br /> <br />. <br /> <br />Alternate "H" Storage at Pinewood Lake and Transmission to Up- <br />graded Water Treatment Plant- ---26 <br />