My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000384
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
3/26/2007 10:33:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/~' - ,'\ <br /> <br />.. ~ Present Worth. Based on Federal Discount Rates <br /> <br />The Present Worth of each Alternate as presented below was determined by ad- <br />ding the estimated present capital construction cost, as developed in secti<lo (1) <br />above, to the capitalized value of 20 years of the annual O&M costs for that <br />particular Alternate, as developed in section (3) above. Regarding the latter, the <br />factor of 11.950 was applied to the annual O&M cost to determine the Present <br />Worth of a series of annual payments over a 20 year period, using 'a Federal <br />Discount Rate of5.50 %. <br /> <br />ALTERNATE <br />************ <br /> <br />PRESENT WORTH <br />****************** <br /> <br />. "A"-Enlarge Crescent Lake. Install New $1.976.900 <br />Raw Water Transmission Line. and Upgrade <br />the Existing Water Treatment Plant (18 acre/foot capacity) <br /> <br />.. <br /> <br />"B"-Enlarge Crescent Lake and Build New Water <br />Treatment Plant (18 acre/foot capacity) <br /> <br />$1. 974.300 <br /> <br />"C" -Construct a Reservoir in Maure Hollow and <br />Upgrade the Existing Water Treatment Plant <br /> <br />1) Imported Material (30 acre/foot capacity) <br /> <br />$2.462.200 <br /> <br />2) Existing Material (45 acre/foot capacity) <br /> <br />$2. 972.200 <br /> <br />"0-2" -Crow Lane Reservoirs <br /> <br />1) Crow Lane #1-20' Dam (12 acre/foot capacity) <br /> <br />$2.140. 100 <br /> <br />2) Crow Lane #1-35' Dam (51 acre/foot capaelty) <br /> <br />$2.445. 100 <br /> <br />3) Crow Lane #2-20' Dam (8 acre/foot capacity) <br /> <br />$2.405.100 <br /> <br />4) Crow Lane #2-35' Dam (39 acre/foot capacity) <br /> <br />$2.680.100 <br /> <br />. <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.