Laserfiche WebLink
<br />.~~?~-.-;-.., <br /> <br />.' <br /> <br />."...... <br />. , <br /> <br />. <br /> <br />ALTE~ "C"--CONSTRUCf A RESERVOIR IN MADRE HOLLmY <br />(USING IMPORtED MATERIAL) AND UPGRADE mE EXISmro: <br />WATER IREATMENT ELANT <br /> <br />New Pump Siation--------------~---------------------------------":'~--------~$8 5,000 <br /> <br />Pipeline to. Reservorr----------..--;.--~--~------------------------------------$30,000 <br /> <br />Expand WTP with 2nd Train----:-------------------~--------------~----~""""-$205,000 <br /> <br />. . <br />. ' . <br />Control Valve at WTP--..------------------------------:.---------------------.;$5 000 <br />. , <br /> <br />Extend Three Phase Power to Site---:..---;..----------------------------$25 000 <br />, ; , <br /> <br />Earthwork/Dam-with Imported MateriaI--------~----------------.;---S 1.375,000 <br />:rOTAL-$1.725.00Q <br /> <br />. . <br />(30 acre/foot reservoir capacity-$57,SOO per acre/foot) <br /> <br />ALTERNATE "C"--CONSTRUcr A RESERVOIR IN MADRE HOLLOW <br />(USING O~-SITE MATERIAL)AND UPGRADE THE. EXISTING WATER <br />TREATMENT PLANT . ' <br /> <br />New Pump . Station -------------,---------,..--------------------..---------------$ 8 5,000 <br />Pipeline to Reservoir-------------;..----------;.-----------------..-------------$30,000 <br /> <br />Expand WTP with.. 2nd Train--------------------------------~------------$205,000 <br /> <br /> <br />Control VaIve at WTP------------------~------------------------------------$ 5,000 <br /> <br /> <br />Extend Three Phase Power to Site--------:---------------------------;...'7""--$25,000 <br /> <br /> <br />Earthwork/Dam-with On-Site Material---------~--------------------$l ,885.000 <br /> <br />IOTAL-~2..235.0QQ <br /> <br />(45 acre/foot'reservoir capacity-$49,700- per acre/foot) <br /> <br />21 <br />