My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000384
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
3/26/2007 10:33:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.._--. <br />...fc.< , <br /> <br />G-COST ESTIMATES <br />*****.************* <br />lJ Construction. <br /> <br />Following are th~ cost estimates for'the individual Alternates taken directly. <br />from the McLaughlin Water Engirieers Planning Document which include an <br />allowance of appro~tely 25% for contingenciesandengineeringAlso . <br />shown are the reservoir capacities, and the cost per acre/foot of storage. . <br /> <br />'. <br /> <br />ALTERNATE "A"-E.NLARGE CRESCENTLAKE. INSTALLlfflW RAW <br />WATER TRANSMISSION,LINE. AND UPGRADE THE EXISTING W A- <br />IER TREATMENT PLANT <br /> <br />New Pump Station --:----------------------.:.------..:.------..--------------------$145,000 . <br />Pipeline to Existing WTP---------------..:.-------.:.-----..----..----...:.---------$235,000 <br />Surge Tank -----..-~--------.:------------------.:---------~--~---':"--~-.:.--------$8 0, 000 <br />Expand'WTP with 2nd Train-------------------..----------:--------------$205,OO'O <br />e;:,} Extend Three Phase Power to Site------------..-..-----------------------$25,000 <br />. Rehabilitation of Diversion StructureIFill Line--------------------------$20,000 <br />Earthwork/Dam ----------~~----------..:-----..-----~--------------------~----.$.49 5. OOQ <br />. TOTAL-J.1.' 205,000 <br />(I8'acre/foot reservoir capacity-$66,900 per acre/foot) <br /> <br />ALTERNATE "B"-ENLARGE CRESCENT LAKE AND BUILD A NEW <br />. WATER TREA'[tvfENI PLANT . <br /> <br />. <br /> <br />N ew. WTP------------------..-------------i--------------------------.:------$49 5,000 <br /> <br /> <br />Rehabilitation of Diversion Structure/Fill Line-----------..--;.----------$20 000 <br />. , <br /> <br />Extend Three Phase Power to Site----..---------------------------..-------$25,000 <br />, . <br /> <br />Pipeline Replacement ------------------------------------------..;----.;.-------$220,000 <br /> <br /> <br /> <br />, Earthwork/Dam ----------------------------------------------------..-------$.4 9 5. OOQ <br /> <br />TOTAL-1.1.255.000 <br />(I8 acre/foot reservoir capacity-$69,700 per acre/foot) <br /> <br />. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.