My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000384
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
3/26/2007 10:33:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. ..?-::-~-.... <br />! i>~ <br /> <br />. <br /> <br />i(.t~~-.......~ <br />'.. "\) <br /> <br />. <br /> <br />4) PWing <br /> <br />a) Treated Water Distribution <br /> <br />In ALTERNATE "B" in the Planning Document, a new treatment plant will <br />be delivering design capacity flow to a relatively remote sectfon of the existing <br />distribution system where the line sizes are 2" and 3" in diameter.. ' <br /> <br />To keep bPerating pressures within satisfactory range, a segment of the 'distri- <br />bution system receiving the full design flow would be replaced with larger <br />.' size pipe, which isiilcluded in the estimate for this Altemate.lt ~planned to <br />use A WW A -C-900 PVC pipe for this new segment, as well.as in any other <br />system rehabilitation projects. <br /> <br />bl Raw Water Transmission <br /> <br />All raw water reservoir fill and draw systems will also use A WW A~C-900. <br /> <br />C-~-SCHEMATICLAYOUT <br />*************************** <br />Exhibit "c" is an overall map of the entire Pinewood Springs Water District <br />system prepared by McLaughlin Water Engineers as part of the Planning Doc- <br />ument on which has been shown the various Alternates being considered. <br /> <br />D-ENVIRONMENTAL IMPACTS <br />*******************.********* <br />In part " C" - " Environmental Resources, " of the PROJECT PLANNING <br />. AREA part of this report, acknowledgement is made of the flood plain, wet- <br />lands, endangered species, and historic sites. . A further evaluation will be sub- <br />mitted in the .form of an Environmental Report, (ER) subject to the review <br />and approval of this Preliminary Engineering Report. <br /> <br />E-LAND REQUJREMENTS <br />*********************.** <br />. Alternates "A" and "B" require the identical amount of land, which is the <br />combination of the site occupied by Crescent Lake, currently owned by the . <br />Pinewood Springs Home Owners Association, and parl6f the adjacent pro- <br />perty currently owned by the Powelson family, and consisting of approxi- <br />mately 2 acres under each ownership. <br /> <br />Contacts had been made by the District with both of these owners,' and satis- <br />factory negotiati<;>ns were anticipated had the District selected either Alternate <br />"A" or "B" as the preferred Alternate. <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.