My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000384
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
3/26/2007 10:33:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />v.'.... <br />. <br /> <br />.. <br /> <br />.. <br /> <br />It has been decided that the most effective approach to provide such'an alter- <br />nate source would be the construction of a ra~ water reservoir which could be <br />filled when the River is. running, and available as a raw water supply when the <br />River is dry, or otherwise incapacitated from possible contamillation. the <br />Planning Document evaluated several such raw water reservoir systems, from <br />which the District has chosen what is identified as " Crow Lane #1 '" as the <br />. preferred alternate, and this will be further described in Section VI of this <br />Report - , <br /> <br />. B) SYSTEM O&M. <br />***************** <br /> <br />, . <br /> <br />The original distribution system for the Pinewood. Springs community was <br />essentially installed by the developer" presumably starting when the first 'plats <br />were filed with the Larimer County Planning Commission in 1959. The sys- <br />tem was subsequently taken over by the Pinewood. Springs Water District for' <br />, operation and maintenance when it was formed in 1978..At pre$ent the piping' . <br />in the distribution system has been in the ground for anywhere from 30 to 40 <br />. years, and possibly more,' and its age is constantly reflected by an above nor- <br />inal.amount of leaks.The repair.of such leaks has had a major and ongoing <br />maiIitenance impact, but District operations has been successful in'keeping it <br />under control. . <br /> <br />In recognition of such leakage, and specifically to reduce the related un-ac- <br />counted for water, the District has created a number of separately metered <br />zones within the distribution system which are regularly monitored to identify <br />and isolate any leakage within any given zone.This is mentioned in the segment <br />of the Planning Document entitled "Treated Water and Distribution System" <br />( on page 3 of Section IV-EVALUATION OF EXISTING WATER TREAT- <br />MENT FACILITIES in the Document.). <br /> <br />The District has. also established a priority listing of those sections of the dis- <br />tribution'system which have exhibited high leakage, and has activated a plan to <br />systematically replace those sections with new piping using current American <br />Water Works specifications to ensure a tighter system as its capacity is ex- <br />panded. <br /> <br />In the summer of 2002, there was a major. frre in the Big Elk Meadows area <br />which lies within the 'natural surface ron-off basin of the Little Thompson <br />River above Pinewood Springs. Much of the resulting ash and other fIre <br />related debris had essentially laid dormant oil the ground surface during the <br />drought period of last year, but was' subsequently dislodged when some later <br />precipitation created run-off which then conveyed the ash into the River. This . <br />material eventually traveled down-River to Pinewood Springs and caused a <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.