My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
3/26/2007 10:33:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />~ Shennan Screec, Room 721 . <br />ver, Colorado 80203 <br />one: (303) 866.3441 <br />FAX: (303) 8664474 <br />www.cwcb.stace.co.us <br /> <br />~ <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />FROM: <br /> <br />Greg E. Walcher <br />Colorado Water Conservation Board Members Executive Director <br /> <br />. , . . /1} ~ Rod Kuharich <br />Bill Green, P.E., Water Supply Planmng and Fmance SectIOn 11 ewCB Director <br /> <br />Mike Serlet, P.E., Chief, Water Supply Planning and Finance Section Dan McAuliffe <br /> <br />Acting Director <br /> <br />TO: <br /> <br />DATE: <br /> <br />January 16,2001 <br /> <br />SUBJECT: <br /> <br />Agenda Item 11 a., January 24-25, 2001 Board Meeting - Water <br />Supply Planning and Finance - Severance Tax Trust Fund Perpetual <br />Base Account New Loans - Town of Monument - Monument Dam <br />Rehabilitation <br /> <br />Introduction <br /> <br />. <br /> <br />The Town of Monument (the Town), acting by and through its water enterprise fund, is <br />applying for a loan of $2,081 ,000 from the Severance Tax Trust Fund Perpetual Base <br />Account for the purpose of rehabilitating Monument Lake Dam. Please see the attached <br />project summary and map. Also attached is a letter from Mike Shoback of the Town of <br />Monument. <br /> <br />Back~round <br /> <br />Monument Lake is located on Monument Creek on the west side of the Town of <br />Monument in El Paso County. The reservoir has a capacity of about 300 acre-feet and is <br />used only for recreational purposes. It is not a part of the Town's water supply system. <br /> <br />The dam and reservoir were authorized by the General Assembly in 1891 and constructed <br />by the State of Colorado in 1893 for flood control and irrigation storage. In 1937, the <br />General Assembly conveyed title to the 81 acres upon which the dam and reservoir are <br />situated to the Town of Monument. In HB 00-1365, the General Assembly provided that <br />the State of Colorado will convey all right, title and interest it may have in the dam to the <br />Town upon completion of repairs to the satisfaction of the State Engineer. <br /> <br />. <br /> <br />The question of responsibility for the dam between the Town and El Paso County (the <br />County), however, has not been entirely clear. An intergovernmental agreement (IGA) <br />dated January 5, 2001 between the Town and the County relieves the County ~f all . <br />responsibility for the dam upon completion of the repair work. The IGA also provides for <br /> <br />Flood Protection. Water Project Planning and Financing. Scream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.