My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
3/26/2007 10:33:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/5/11 u--. <br /> <br />STATE OF COLORALJU <br /> <br />Q <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />1313 Sherman Street, Room 721 <br />Denver. Colorado 80203 <br />Phone: (3031 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />Bill Owens <br />Governor <br /> <br />April 20, 2001 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Mr. Rick Sonnenberg <br />Town Manager <br />Town of Monument <br />P.O, Box 325 <br />Monument, Colorado 80132 <br /> <br />Rod Kuharich <br />(WeB Director <br /> <br />Dan Mc"'ulifie <br />Deputy Director <br /> <br />Re: Monument Lake Dam Feasibility Study <br /> <br />Dear Mr. Sonnenberg: <br /> <br />We are in receipt of the Feasibility Study for Monument Lake Dam dated March 23, 2001 from Boyle <br />Engineering. The report fully meets the feasibility study requirements of the Colorado Water Conservation <br />Board Guidelines for Financial Assistance. The Town may submit an invoice under the enclosed purchase <br />order for $5,000.00 from the Feasibility Study Small Grant Account. <br /> <br />Please coordinate with Ian Illian of this office on all matters related to contracting. She will be responsible <br />for drafting and processing of contract documents. <br /> <br />Tim Feehan of this office will be responsible for reviewing the project plans and specifications and for all <br />matters related to project construction including approval of design and construction payments. Please <br />coordinate with him on project design and construction. <br /> <br />You may also want to refer to Section 5.0 and Appendices E, F and G of the Guidelinesfor Financial <br />Assistance through the Colorado Water Conservation Board Construction Fund for information relating to <br />design and construction administration of CWCB.funded projects. <br /> <br />We look froward to working with you on the construction of the Monument Lake Dam rehabilitation <br />project. <br /> <br />Sincerely, <br /> <br />73.d1~~ <br /> <br />William E. Green, P.E. <br />Manager of Planning <br />Water Supply PlanniIig and Finance Section <br /> <br />Enclosure <br /> <br />Cc: Mike Serlet <br />Tim Feehan <br />I an Illian <br />Steve Biondo <br />Linda Bassi, AGO <br />Ed Toms, Boyle Engineering <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection . Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.