My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150171 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150171 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:25 AM
Creation date
3/26/2007 10:32:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150171
Contractor Name
Terrace Irrigation Company, The
Contract Type
Loan
Water District
0
County
Conejos
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS ~nd PHONE <br />L11v'IS aA:6"/A/r3E/2/JfJG- /3/4 1/771. 4Vtf:; .A~Jl(()SA CD y//t) / <br />(ALAN MVEY) ?If: 7/9. 7f9. 3a> cJ <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. cJ7ztf)'/ tAl ~()c.B;, c; , IUi LL /0/ / /J tV' 900Al <br />I <br /> <br />9. Estimated cost of the project. Please include estimated engmeenng costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 4~."C> -48CV .00 <br /> <br />$ ..200, ocx:J. 00 <br />/ <br />$ 20;>: oco. 00 <br />I <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 19~, OCJtJ . QO (Usually 75% of Estimated Total Costs) <br />Term (length) of loan: 3'0 ye~rs (Usually to, 20, or 30 years) <br />Interest Rate: 2.~- % (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, financial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />I. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. <br /> <br />1 <br /> <br />CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.