My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150171 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150171 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:25 AM
Creation date
3/26/2007 10:32:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150171
Contractor Name
Terrace Irrigation Company, The
Contract Type
Loan
Water District
0
County
Conejos
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach separate sheets if needed, and a map <br />of the service area. ePEE /17771cJ1eD 21" <br /> <br />For existing facilities indicate: <br />Number of shareholders 2. 7 <br />Current Assessment per share $ 21 ~o <br />Number of acres irrigated g{)t:)~ <br /> <br />or Number of customers served <br /> <br />Number of shares <br /> <br />'73/. '37r <br /> <br />Part B. - Description of the Project <br />1. Name ofthe project or facility ~ rpE5EJ2.Vt7'R... j)AA,f <br /> <br />2. Purpose ofthis loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br /> <br />/ <br /> <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES ~ NO _ <br /> <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown. r ('I~ .A l!;l.L.H-E-p M.4 P <br /> <br />s. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. --,- <br />/AbJ-Uf)ES; 1f?eF>AIR. DF 6A1E,,: ea=AN/AJ("7"""" S/4"""ClfeJI<E() lVAJlJ8L;.i <br />I <br />t<eFl.A::E 7l?AS# ~: "BUILD.L /)/SJ.ALlJAJTLE COJ"FEJ!( DAJ.-f REt:f., 70 ~L <br />'" - <br />RIVER- DURING Aeove ~EPAIR <br /> <br />Water Right: gEE'" ArrCFS. ~8 Average water diverted per year: 767~r acre-feet. <br />7P~ Rtv8A. WA7E-e: Cf75"z.A.p'. <br />6. Will the acquisition of additional water rights be necessary? YES _ NO ~ <br /> <br />2 <br /> <br />CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.