My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000379
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:54:01 PM
Creation date
3/26/2007 10:32:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150100
Contractor Name
East Dillon Water District
Contract Type
Loan
Water District
5
County
Summit
Bill Number
Bill 02-1152
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br /> <br />- 2 - <br /> <br />Financial Plan <br /> <br />1. 30 Year Financial Projection (Appendix F) - As we have discussed on the phone the <br />spreadsheet will need to be revised to show the required CWCB Loan Reserve Fund <br />of one-tenth of the annual loan payment ($151,975.53) for the first ten years ofthe <br />loan. Accordingly, the amount of$15,198 needs to be shown as a separate line item <br />in the 30-year Financial Projection for years 2003 through 2012. Alternatively, you <br />could maintain the current $75,988 shown in 2002 and add Loan Reserve Fund <br />amounts of$15,198 in years 2008 through 2012. <br /> <br />These changes also need to be reflected in Table 8 (p. 27) - Summary of30-year <br />Financial Projection, as well as the text on p. 26 adjusted as necessary to clarify what <br />is being done with the Loan Reserve Fund deposits. <br /> <br />2. Reserve Funds - In conjunction with the above revisions pertaining to the CWCB <br />Loan Reserve the District may want to give some additional consideration to the <br />remaining level of operating and capital reserves being projected in the early years of <br />loan repayment, particularly the years 2005 and 2007. <br /> <br />Once the changes have been made please submit 3 copies of the Final Feasibility Study Report to <br />our office and I will send a formal letter of acceptance of the Final Feasibility Study. Prior to <br />printing the final copies it would be helpful if you could mail or fax me the revised financial tables <br />for a quick final review. <br /> <br />If you have any questions please contact me at 303-866-3428. Thank you. <br /> <br />Sincerely, <br /> <br />(tn'r <br /> <br />Bruce L. Johnson, P.E. <br />Water Supply Planning and Finance Section <br /> <br />cc: Anne Janicki, CWCB <br />J an lllian, CWCB <br />Charles E. Stanzione, Bishop-Brogden Associates, Inc. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.