My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150125 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150125 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 10:14:07 AM
Creation date
3/26/2007 10:31:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150125
Contractor Name
Surface Creek Ditch & Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />uct-31-2002 11 :32am From- <br /> <br />T-599 P.002 <br /> <br />F-972 <br /> <br />IIIIIRESOURCE <br />1..1.1 ' <br />~....,E' N G I .N E E R I N GIN C . <br /> <br />,fVIr. Jim Norfleet, P.E. <br />Division 4 Dam Safety Engineer <br />.colorado Division of Water Resources <br />~O Box 456 <br />Montrose CO 81402 <br /> <br />July 11, 20Qf, <br /> <br />. Mr. Jack Byers, P.E. <br />Dam Safety Branch <br />Office of the State Engineer <br />1 313 Sherman Street, Room 818 <br />Denver CO 80203 <br /> <br />RE: Design Report for Hotel Twin Dam Rehabilitation - 200'Z.Repair and Modification <br /> <br />Dear Jim and "'ack: <br /> <br />This letter report presents the background data and design criteria for proposed <br />improvements to the Hotel Twin Dam. The Improvements Include repair and <br />modification of the dam to address dam safety issues and road. improvements. <br /> <br />~ACKGROUND <br /> <br />,Resource Engineering, Inc. (RESOURCE) reviewed the 1953 engineering design drawing <br />~or improvements to the outlet and embankment of the dam, recent dam safety <br />,hispection reports by the Division of Water Resources, correspondence from Ed Currier <br />regarding construction of temporary toe drainage structures, correspondence from the <br />State Division of Water Resources dated September 25, 2000 and January 10, 2001 <br />regarding installation of the temporary drain system, correspondence from the State <br />dated September 7, 2000 regarding restriction of storage and dam safety concerns that <br />,need to be addressed, interviews with the Delta County District 2 Road and Bridge <br />Department, and interviews with Division 4 Dam Safety Engineer, Jim Norfleet. <br /> <br />The Inspection reports, correspondence, and field investigations to date indicate that <br />the significant dam safety Issues include seepage on the downstream slope, seepage <br />around the spillway pipeline, seepage at the left abutment approximately 10 to 1 2 feet <br />below the spillway pipe, a depression In the pavement at the right abutment, a <br />depression on the right side of the upstream embankment, a void area located in the <br />eastern end of the embankment and the apparent loose fill material (inpluding organic <br />material) on the downstream embankment. The existing road across the dam is part <br />of a road Improvements plan authorized by Congress. Therefore, 8 wider dam cross <br />section has been incorporated Into the design of the dam repair. <br /> <br />PROPOSED IMPROVEMENTS <br /> <br />To address the above outlined dam safety concerns and to Incorporate a new road <br />~ross section, the following improvements are proposed. <br /> <br />Consulting Enginee/"e end Hydrologists <br />
The URL can be used to link to this page
Your browser does not support the video tag.