Laserfiche WebLink
<br />Mr. James 1. White <br />City Administrator <br />December 4, 1997 <br /> <br />2 <br /> <br />d. Y ou must adhere to the CWCB Design and Construction Administration Procedures. <br />Mike Serlet will work with you on the CWCB requirements concerning design and <br />bidding of the construction project. During the construction process he will make field <br />inspections, which will be the basis of the monthly pay estimates for disbursements of <br />your loan funds. <br /> <br />e. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />Guidelines has been provided to you. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan from <br />the Colorado Water Conservation Board. <br /> <br /> <br />J Sciver, P.E. <br />Colorado Water Conservation Board <br /> <br />Attachment: Updated Memo: Idaho Springs97.memo <br /> <br />cc (w/Attachment): Ms. Elizabeth Ann Rieke, Board Member CWCB <br /> <br />cc (w/o Attachment): CWCB Section B Staff <br />Linda Bassi, AGO <br /> <br />D:\ldahoSprings97.1ll' <br />