My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000363
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:54 AM
Creation date
3/26/2007 10:30:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153697
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br />--- <br />1 <br /> <br />June 20, 1994 <br />page 4 <br /> <br />COST, SCHEDULES, AND DIVISION OF RESPONSIBILITY <br /> <br />~ <br />. <br /> <br />Enaineerinq Costs. The need to select and evaluate <br />alternative sites, and cost of geotechnical and mapping data <br />for each site, adds considerable cost to the study. <br />If we were to start brand-new (with no prior information) to <br />prepare a Feasibility Report of this nature, the fee would <br />probably be $15,000 to $18,000 dollars. Of that amount, <br />approximately $4000 would be for geotechnical investigations <br />and $4,000 to $5,000 would be for aerial photos and mapping. <br />These costs include engineering costs to coordinate the <br />geological and map subcontractors, and also to map both the <br />alternate sites and the selected site. The actual engineering <br />work for the remainder of the report would normally be in the <br />range of $8,000 to $9,000. At this time, the Norwood Water <br />commission has expended approximatelY $7,500 for the geological- <br />and mapping work, and about $1,300 for-preliminary eng1neering <br />~ A~~achment A). ~ <br /> <br />Our proposed cost to complete the Feasibility Report are <br />as follows: <br /> <br />~ <br /> <br />1. Additional subsurface investigat~~~h backhoe, <br />plus narrative report from Li~~~re - <br /> <br />2. Additional on-site mapping (~~ati~1i~~~ <br />and preliminary measurements ~~~ <br /> <br />3. Engineering work by WWE for1i.~ preparation <br /> <br />Subtotal cost <br /> <br />$1,200 <br /> <br />500 <br /> <br />6.500 <br /> <br />- $8,200 <br /> <br />Add-on for more detailed map from Air Photos <br /> <br />- $1.500 <br /> <br />Total Cost <br /> <br />- $9,700 <br /> <br />Billings will be submitted monthly based on actual costs. <br />A copy of our rate sheet is enclosed. <br /> <br />We had previously assembled a list of water rights for the <br />Preliminary Engineering Report. This may be adequate for the <br />Feasibility Study; however, if you wish to have your attorney <br />review these rights to determine their validity, that would be <br />an additional cost. Please advise. <br /> <br />CWCB has provided financial assistance for preparation of <br />Feasibility Reports in the past. It may be possible for CWCB <br />to cover a portion or all of your costs for this report. Based <br />on the numbers given above, the total cost for the report is as <br />follows: <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.