Laserfiche WebLink
<br />Water Riqhts <br /> <br />The Quint's currently have decrees on the 4 wells used for <br />irrigating their farm. These wells are augmented through GASP, <br />The proposed recharge well will require a new water right and is <br />currently being sought. This new recharge water right will be for <br />a maximum of 3000 gpm with an average annual yield of 1200 acre <br />feet, <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $95,000, <br /> <br />Item <br /> <br />1, Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />Estimated Cost <br /> <br />$ 4,000 <br />$ 91,000 <br /> <br />$ 95,000 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />l. <br />2. <br />3. <br />4. <br />5, <br />6, <br /> <br />Drill Well <br />Well and Installation <br />18" PVC Pipe Installed (4600 linear <br />Electricity for well <br />Contingency <br />Planning and Design Costs <br /> <br />Total Cost <br /> <br />Implementation Schedule <br /> <br />Estimated Cost <br /> <br />$ <br />$ <br />feet)$ <br />$ <br />$ <br />$ <br /> <br />13,000 <br />15,000 <br />46,000 <br />10,000 <br />7,000 <br />4,000 <br /> <br />$ 95,000 <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3, Complete Construction <br />4. Project is Operational <br /> <br />Feasibility Study <br />Victor Quint <br />Aug Project <br />July 2003 <br /> <br />6 <br /> <br />Date <br />07/31/03 <br />08/04/03 <br />08/18/03 <br />08/19/03 <br />