My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000343
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2010 8:54:01 AM
Creation date
3/26/2007 10:28:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150147
Contractor Name
Quint, Victor and Margie
Contract Type
Loan
Water District
0
County
Morgan
Washington
Bill Number
MC4
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Riqhts <br /> <br />The Quint's currently have decrees on the 4 wells used for <br />irrigating their farm. These wells are augmented through GASP, <br />The proposed recharge well will require a new water right and is <br />currently being sought. This new recharge water right will be for <br />a maximum of 3000 gpm with an average annual yield of 1200 acre <br />feet, <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $95,000, <br /> <br />Item <br /> <br />1, Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />Estimated Cost <br /> <br />$ 4,000 <br />$ 91,000 <br /> <br />$ 95,000 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />l. <br />2. <br />3. <br />4. <br />5, <br />6, <br /> <br />Drill Well <br />Well and Installation <br />18" PVC Pipe Installed (4600 linear <br />Electricity for well <br />Contingency <br />Planning and Design Costs <br /> <br />Total Cost <br /> <br />Implementation Schedule <br /> <br />Estimated Cost <br /> <br />$ <br />$ <br />feet)$ <br />$ <br />$ <br />$ <br /> <br />13,000 <br />15,000 <br />46,000 <br />10,000 <br />7,000 <br />4,000 <br /> <br />$ 95,000 <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3, Complete Construction <br />4. Project is Operational <br /> <br />Feasibility Study <br />Victor Quint <br />Aug Project <br />July 2003 <br /> <br />6 <br /> <br />Date <br />07/31/03 <br />08/04/03 <br />08/18/03 <br />08/19/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.