My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150086 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150086 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:12 AM
Creation date
3/26/2007 10:27:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150086
Contractor Name
Glenwood Irrigation Company, The
Contract Type
Loan
Water District
40
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS and PHONE <br /> <br />Dennis Davidson, Natural Resources Conservation Services <br />401 23'd. St., Glenwood Springs, Co. 81602 <br />Phone 970 945 5494 <br /> <br />Loyal E. Leavenworth Atty._ <br />Phone 970 - 945 - 2261 <br /> <br />P.O.Drawer 2030; Glenwood Springs Co. 81602 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now <br />in progress for the proposed project. Please submit one copy of each completed study <br />with this application. Preliminary Engineering Report is attached <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: $ <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />14.212 <br /> <br />$ 95,750 <br /> <br />$ 108,962 <br /> <br />10. Loan amount and terms you are requesting. <br /> <br />Requested Loan Amount: <br /> <br />$ 85,000 <br /> <br />(Usually 75% of Estimated <br /> <br />Total Costs) <br /> <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />30 years <br /> <br />vears <br />% <br /> <br />(Usually 10,20, or 30 years) <br />(Please call for our current <br />rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor have the <br />[mancial capacity to repay any loans made by the CWCB. The following information is needed to assist the <br />CWCB in a preliminary assessment of the applicant's [mancial capacity. It is also requested that the project <br />sponsor submit with this application copies of the two most recent annual reports, financial statements, <br />corporate reports or other current documentation of [mancial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For <br />example, bank loans, government agency loans, bond issues, accounts payable, etc. <br />Include names and addresses of lenders, amounts, due dates and maturity dates. Attach a <br /> <br />C'Clo_""". <br /> <br />" ~,~,rc; <br />
The URL can be used to link to this page
Your browser does not support the video tag.