My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150228 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150228 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 3:00:45 PM
Creation date
3/26/2007 10:25:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150228
Contractor Name
Riverside Irrigation District
Contract Type
Loan
Water District
0
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Borrower will use this loan to payoff this existing debt. <br /> <br />SECTION 6 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> <br />No additional conditions. <br /> <br />SECTION 7 - CONSTRUCTION FUND PROGRAM PROCEDURES FOR WATER PURCHASE <br />PROJECTS. <br />A. CWCB Loan Policy #8 requires that BORROWER must submit a written appraisal or <br />opinion of value from a qualified water rights appraiser supporting the purchase <br />price prior to disbursal of loan funds. The 46 Private Rights were purchased by <br />Borrower at a widely advertised public auction, therefore no additional appraisal or <br />opinion of value is required. <br /> <br />B. The BORROWER shall pay all of the expenses related to the PROJECT when such <br />bills are due. <br /> <br />SECTION 8 - ELIGIBLE EXPENSES FOR WATER PURCHASE PROJECTS. <br />A. Engineering associated with the feasibility report prepared as a requirement for <br />this loan and associated with evaluating the suitability of the water rights for <br />purchase by the BORROWER. <br />B. Interest during completion of the PROJECT pursuant to Paragraph A.4 herein. <br />C. Legal services for reviewing engineering services contracts and this Contract. <br />D. Purchase of the water rights. <br />SECTION 9 - DISBURSEMENT SCHEDULE <br />For loan payoffs: For loan disbursements to payoff existing debt described in <br />Section 5, the BORROWER shall provide the CWCB with a request that includes the <br />amount needed to pay in full each existing loan, the loan number and the name <br />and address, of the creditor, and the phone number and name of creditor contact. <br />After review and acceptance of the request, the CWCB will pay to the Borrower the <br />amount set forth in the request. Payment of said request shall be made within <br />thirty (30 days from the CWCB's approval of said request). <br />SECTION 10 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract <br />is signed by the State Controller or his designee). <br />PROJECT Finish: Two years from the Effective Date of this Contract. <br /> <br />Appendix 1 to Loan Contract C150228 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.