My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150228 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150228 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 3:00:45 PM
Creation date
3/26/2007 10:25:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150228
Contractor Name
Riverside Irrigation District
Contract Type
Loan
Water District
0
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Summary - Riverside Irrigation District <br />Contract No. C150228 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Riverside Irrigation District <br />Address: 221 E. Kiowa, Fort Morgan, CO 80701 <br />Federal Identification No.: 84-0840086 <br />Contact: Don Chapman, Superintendent <br />Phone Number: (970) 867-6586 Fax Number: (970) 867-0923 <br />E-mail address:noworries@twol.com <br />Type of Entity: The Riverside Irrigation District is an irrigation district <br />formed pursuant to and governed by Article 41, Title 37, <br />C.R.S. and located in Morgan and Weld Counties. <br />Section 2 - Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used to provide permanent financing for the acquisition of 46 Private Rights in <br />the Riverside Reservoir and Land Company, hereinafter referred to as the <br />PROJECT, at an estimated total cost of $1 ,638,000. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br />report on the PROJECT compiled by Brent Nation, P.E., which is incorporated herein <br />by reference, and, based upon the feasibility report, the CWCB determined the <br />PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Severance Tax Trust Fund Peroetual Base Account: This loan is made pursuant to <br />the provisions of 99 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br /> <br />Section 37-60-122(1 )(b) C.R.S., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly <br /> <br />SECTION 4 - BOARD ApPROVAL <br /> <br />At its May 16, 2006 meeting, the CWCB approved a loan from the CWCB Severance <br />Tax Trust Fund Perpetual Base Account to the BORROWER in an amount up to <br />$1,464,500 for PROJECT costs, not to exceed 90% of the cost of the PROJECT, with a loan <br />origination fee of 1 % in accordance with eWCB Policy No. 16, at an interest rate of 2.5% <br />per annum for a repayment term of 30 years. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />Bank of Colorado; principal amount $1,387,625; matures February 8, 2007. The <br /> <br />Appendix 1 to Loan Contract C150228 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.