Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />Riverside Reservoir on the South Platte River. <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />The water purchased will come from water assets dispersed due to the GASP <br />liquidation. This water has been used exclusively by Riverside since the water was <br />acquired by GASP throuqh trades and exchanqes. The water is used by the Riverside <br />Irriqation District as supplemental irriqation water for the landowners to the storaqe, <br />direct flow and recharqe water already owned by the District. The loss of use by the <br />Riverside Irriqation District of this water will cause a significant reduction to the water <br />supply available to the District. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES X NO <br /> <br />If YES, please explain. <br /> <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br /> <br />NAME <br /> <br />ADDRESS and PHONE <br /> <br />Nation Engineering: 229 East Kiowa Avenue, Fort Morgan, CO 80701, Ph; 970-867- <br />2883 <br />Hill & Robbins, P.C.: 1441 Eighteenth Street, Denver, CO 80202, Ph: 303-296-8100_ <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Nation Engineering study <br /> <br />9. Estimated cost of the project. Please include estimated engmeenng costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: $500.00 <br /> <br />3 <br />