Laserfiche WebLink
<br />eWCR Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the. owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach separate sheets if needed, and a map <br />of the service area.: Water is stored in the Riverside Reservoir in Weld County. There <br />are 2505 rights in this reservoir; the District now owns 1999 of these rights, numerous <br />other recharge water rights, a 1907 direct flow priority and a storage right in Vancil <br />Reservoir. Water is delivered to district landowners by the Riverside canal extending <br />from Riverside Reservoir for a distance of about 90 miles. The District dedicates <br />$185,000 yearly for the maintenance of this canal and does not have any major <br />maintenance problems. <br /> <br />For existing facilities indicate: <br />Number of farm owners: 147 <br /> <br />or Number of served: 147 <br /> <br />Current tax levy per district acre: $1 0.00 <br />Number of acres irrigated: 22,494 Water Right: _ 417 CFS. <br /> <br />Average water diverted per year: _108,000 <br /> <br />acre-feet. <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility: 2006 GASP Water Purchase <br /> <br />2. Purpose ofthis loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />X Other (describe) To purchase water being dispersed in the GASP liquidation <br />and other water authorized during 2006. <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO_ <br /> <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. Reservoir storage water in <br /> <br />2 <br />