Laserfiche WebLink
<br />ST A TE OF COLORADO <br /> <br />Colorado Waier Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br />(Updated November 26,2003) <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />FROM: <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section. <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: November 12, 2003 <br /> <br />SUBJECT: Agenda Item #8a, November 19-21, 2003 Board Meeting <br />Water Supply Planning and Finance - Construction Fund and <br />Severance Tax Trust Fund Perpetual Base Account New Loans - <br />Colorado River Water Conservation District - Elkhead Reservoir <br />Enlargement <br /> <br />Introduction <br />The Colorado River Water Conservation District (River District) is applying for a loan in the <br />amount of $11,000,000 to enlarge Elkhead Reservoir located on Elkhead Creek northeast of <br />Craig in Routt and Moffat Counties. The River District, in conjunction with the Upper Colorado <br />Endangered Fishes Recovery Program (Recovery Program), propose to enlarge the reservoir for <br />the purposes of supporting the recovery of endangered fish species and to satisfy needs for <br />supplies of municipal, industrial and agricultural water in the Lower Yampa River basin. The <br />estimated total cost of the project is $19.5 million. Please see the attached project summary and <br />map. <br /> <br />Backaround <br />Elkhead Reservoir was constructed in the 1970s as a cooperative project between the Colorado <br />Division of Wildlife (DOW) and the Yampa participants, comprised of a consortium of power <br />companies that own generating capacity at the Craig coal-fired power plant. In 2002, the City of <br />Craig obtained DOW's interest in the reservoir. In February 2002, the River District entered into <br />an Intergovernmental Agreement with Craig to enlarge Elkhead Reservoir. <br /> <br />The Recovery Program began work on a Management Plan for the endangered fish species in <br />the Yampa River basin (Yampa Plan) in 1993. The plan is currently in final draft form with final <br />action by the Management Committee of the Recovery Program expected by the end of the year. <br />Among other recovery actions, the Yampa Plan identifies a need for up to 7,000 acre-feet (af) of <br />water to augment low flows in the Yampa River, primarily below the town of Maybell, during late <br />