Laserfiche WebLink
<br />Colorado River Water Conservation District <br />November 26, 2003 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. <br />Tim Feehan, P.E. will contact you regarding the CWCB requirements concerning <br />project bidding, design, and construction. Tim will make construction inspections, which <br />will be the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. <br /> <br />Sincerely, <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Greg Hoskin, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda J. Bassi, AGO <br />Chrono File <br />