My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150160 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150160 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:09:44 AM
Creation date
3/26/2007 10:15:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150160
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Adams
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />Contract, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br />J. Engineering associated with the feasibility report prepared as a requirement for <br />this loan and associated with evaluating the suitability of the water rights for <br />purchase by the BORROWER. <br />K. Legal services for reviewing engineering services contracts and this Contract. <br />L. Purchase of the water rights. <br />SECTION 9 - DISBURSEMENT SCHEDULE <br />For Project costs: The BORROWER shall prepare a periodic progress report which <br />contains a statement of the PROJECT costs expended for that period and shall <br />forward said statement to the CWCB. After receipt of the periodic progress report <br />from the BORROWER, and review and acceptance of the items therein as eligible <br />expenses as described below, the CWCB will pay to the BORROWER the amount <br />set forth in the report or such portion that has been approved by the CWCB. Such <br />payment shall be made within thirty (30) days from the CWCB's approval of each <br />progress report. <br />For a water rights purchase, the BORROWER shall prepare a written request for funds <br />that shall describe the upcoming closing on water rights purchase including, but not <br />limited to, the name of the seller, cost, closing date, and appraisal value and support <br />documentation in the form of copies of the sales agreement and the appraisal <br />pursuant to Section 7(a) above. After receipt of the written request from the <br />BORROWER, and review and acceptance of the items therein as eligible expenses as <br />described above, the CWCS will pay to theSoRRowER the amount set forth in the <br />request or such portion that has been approved by the CWCB. Such payment shall be <br />made within thirty (30) days from the CWCBis approval of each request. <br />SECTION 10 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract <br />is signed by the State Controller or his designee). <br />PROJECT Finish: Three (3) years from the Effective Date of this Contract <br /> <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.