My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150160 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150160 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:09:44 AM
Creation date
3/26/2007 10:15:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150160
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Adams
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br /> <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BORROWER and found acceptable by the CWCB staff. <br /> <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br /> <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br /> <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br /> <br />I. The BORROWER shall construct the PROJECT in accordance with the approved <br />plans and specifications. <br /> <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by 937-87-105, C.R.S., <br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br /> <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br /> <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such <br />bills are due. <br /> <br />M. The BORROWER must submit a written appraisal or opinion of value from a qualified <br />water rights appraiser supporting the purchase price prior to disbursal of loan <br />funds. <br /> <br />SECTION 8 - ELIGIBLE EXPENSES. The following items are eligible for loan <br />disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.