My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150160 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150160 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:09:44 AM
Creation date
3/26/2007 10:14:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150160
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Adams
Morgan
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Central Colorado WCD <br />November 25-26, 2002 <br /> <br />Agenda Item 20e. <br />(Updated December 4, 2002) <br /> <br />expanded the use of their water right. The Moyers filed a counter-suit arguing that the <br />Colorado State Engineer had allowed Empire Lodge to fill its upstream lake illegally <br />under a substitute supply plan approved by the State Engineer. <br /> <br />The case was ultimately heard by the Colorado Supreme Court, and at the end of last <br />year, it ruled the State Engineer did not have the legal authority to approve substitute <br />supply plans. The Court went on to say that a substitute supply plan (such as the one <br />operated by the Subdistrict) would either have to file for a decree in Water Court, or <br />follow new Rules & Regulations to be issued by the State Engineer. Either alternative <br />would raise the standard required for approval. Ultimately, the Subdistrict will need to <br />acquire more senior water rights as well as build additional storage to augment out-of- <br />priority diversions <br /> <br />Feasibility Studies <br />The GMS-CCWCD has completed a feasibility study. The study includes an assessment <br />of alternatives available to provide additional augmentation water for its members. <br /> <br />Water Riahts, <br />The GMS-CCWCD currently owns water rights as listed in Table 1: <br /> <br />Table 1 : Water Rights Owned <br />Groundwater Management Subdistrict of the <br />Central Colorado Water Conservancy District <br />2002 <br /> <br />Comoany <br /> <br />Box Elder Ditch <br />Brighton Ditch <br />Farmer's Independent Ditch <br />Fulton Ditch <br />Greeley & Loveland Ditch <br />Greeley Irrigation Ditch <br />Jones Ditch <br />Lake Loveland <br />Lupton Bottom Ditch <br />Lupton Meadows Ditch <br />RuraJ Ditch <br />Seven Lakes Reservoir <br />Union Reservoir <br />Weldon Valley Ditch <br /> <br />TOTAL <br /> <br />Location <br /> <br />Amount <br />(acre-feet) <br /> <br />Windsor <br />Brighton <br />Platteville <br />Brighton <br />Greeley <br />Greeley <br />Greeley <br />Loveland <br />Fort Lupton <br />Fort Lupton <br />Longmont <br />Loveland <br />Longmont <br />Fort Morgan <br /> <br />50 <br />20 <br />81 <br />628 <br />413 <br />680 <br />15 <br />260 <br />600 <br />120 <br />53 <br />240 <br />200 <br />150 <br /> <br />3,510 acre.feet <br /> <br />Groundwater Recharae Proiects <br />In 1979, the Subdistrict began developing a groundwater recharge program to <br />supplement the amount of water available for augmentation purposes. Numerous sites <br />have been developed in the Platteville, Greeley, Fort Morgan, and Hudson areas. To- <br />date, over 70,000 acre-feet of water has been recharged through these various projects. <br />A list of projects is shown in Table 2: <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.