<br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Purchases <br />2. Start Change of Water Rights <br />3. Apply for State Aug Plan Approval <br />4. Water Useable for Augmentation <br /> <br />Date <br />06/01/04 <br />06/02/04 <br />06/02/04 <br />08/23/04 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />Although 3T Cattle will be impacted with costs associated with <br />their portion of the water costs and loan repayment, the project <br />will have a long term positive economic impact by assuring the <br />continued use of their well and therefore the continued operation <br />of the feedlot. <br /> <br />The project will have no significant physical impacts. <br /> <br />Per.mitting <br /> <br />All easements and rights of way are controlled by the Company <br />supplying the water, therefore no further arrangements are <br />required nor are any permits required. <br /> <br />Financial Plan <br /> <br />The total cost of the project is $275,000. $247,500 or 90% may <br />come from a loan with the Colorado Water Conservation Board, and <br />the remainder from the project sponsor, 3T Cattle. The CWCB Loan <br />Application is found in Appendix C. <br /> <br />A $247,500 CWCB loan at 2.5% interest over a 30-year repayment <br />period would calculate to an annual payment of approximately <br />$13,000. The loan payment of $13,000 amounts to approximately <br />$130 per acre foot of consumptive use water produced from the <br />purchased shares. The loan payment will have to be incorporated <br />into the annual budget of the feedlot. <br /> <br />Feasibility Study <br />3T Cattle Company Aug Project <br />April 2003 <br /> <br />4 <br />