My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000249
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2010 11:17:42 AM
Creation date
3/26/2007 10:13:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150175
Contractor Name
3T Cattle Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Selected Project <br /> <br />3T Cattle plans to pursue alternative #2. Features of this <br />alternative are as follows: <br /> <br />1. Purchase up to 5 shares of the Weldon Valley Ditch Company. <br /> <br />2. Convert the shares to augmentation use and incorporate the <br />water into a court approved augmentation plan. <br /> <br />Water Rights <br /> <br />3T Cattle currently only has the water right decreed with the one <br />well used for the feedlot. The well can pump between 90 and 112 <br />acre-feet of water annually for a full feedlot. <br /> <br />The water for purchase is decreed as <br />Decree Date <br />Weldon Valley Ditch 10/26/1881 <br /> <br />follows: <br />Estimated Delivery <br />38 AF/share (gross) <br />18-20 AF/sh (consumptive) <br /> <br />The total estimated consumptive use delivery of all the rights is <br />between 90 and 100 Acre-feet. A through consumptive use analysis <br />will have to be performed to determine the exact usable amount <br />and timing for augmentation. Preliminary analysis based on gross <br />pumping compared to gross deliveries seems to indicate an <br />adequate correlation. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $275,000. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 5,000 <br />$270,000 <br /> <br />$275,000 <br /> <br />1. Planning and Engineering Costs <br />2. Water Costs (5 shares) <br /> <br />Feasibility Study <br />3T Cattle Company Aug Project <br />April 2003 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.