Laserfiche WebLink
<br />Water Conservation Plan <br /> <br />SECTION 8 <br />IMPLEMENT A TION PLAN <br /> <br />Section 8 presents a strategy and timetable for implementing conservation measures and other <br />elements of the Water Conservation Plan. This includes monitoring and evaluating the water <br />conservation activities and revising and updating the Water Conservation Plan. <br /> <br />A worl(shop was held on March 2, 2006 to select the measures and programs that would be <br />implemented as part of this plan and to discuss the logistics of their implementation. The <br />participants of the worl(shop included members of the Authority's staff along with engineers <br />from Richard P. Arber Associates. The worl(shop was held at the office of the Authority. <br /> <br />8.1 IMPLEMENTATION SCHEDULE <br /> <br />The implementation of the measures and programs will be spread throughout the 10 year <br />planning period of this Water Conservation Plan. Measures and programs will be phased in order <br />to spread out the capital costs and increased administrative efforts required for the projects. <br />Table 8-1 summarizes the implementation schedule for the existing conservation activities and <br />the chosen future measures and programs. <br /> <br />November 2006 <br /> <br />29 <br /> <br />Richard P. Arber Associates, Inc. <br />