My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02000000008 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
02000000008 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 10:36:39 AM
Creation date
3/9/2007 11:23:16 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
02000000008
Contractor Name
Lake Canal Reservoir Company
Contract Type
Grant
Water District
0
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ _ _ _ ___�_ \ _ _ <br />� �, <br />STATE OF COLORADC7 � <br />�. <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Sh�eet, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />Mr. Rodney Nelson, President <br />The Lake Canal Reservoir Company <br />P.O. Box 104 <br />Lucerne, CO 80646 <br />Dear Mr. Nelson, <br />April 7, 2000 <br />RE: Feasibility Study <br />Grant Approval <br />.� a. <br />� <br />��... <br />��� =: " <br />Bill Owens <br />Govemor <br />Greg E. Walcher <br />Executive Director <br />Peter H. Evans <br />CWCB Director <br />Dan McAuliffe <br />Deputy Duector <br />I am pleased to inform you that I have approved your request for a grant from the <br />Feasibility Study Small Grant Account. The maximum amount of the grant is $5,000, for <br />up to 50% of the cost to complete the Feasibility Study for the rehabilitation of Gray Lake <br />#3 Dam. I understand that the report will meet the requirements of the CWCB <br />Construction Fund Guidelines for feasibility studies. <br />John Van Sciver of this office has reviewed your preliminary application materiafs. John <br />will contact you concerning this project, and assist you through the construction loan <br />process. <br />On behalf of the Board, I would like to thank you for applying for a feasibility study grant <br />from the Colorado Water Conservation Board. <br />� erely, <br />� <br />Peter H. Evans, Director <br />Colorado Water Conservation Board <br />cc: Duane Smith, P.E., Smith Geotechnical, 1225 Red Cedar Circle, Suite H, Fort Collins, CO 80524 <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />Section B(Mike Serlet and John Van Sciver) <br />Chrono File <br />C: WP511Proj-NewlLakeCanalFSGrant400Ltr <br />
The URL can be used to link to this page
Your browser does not support the video tag.