Laserfiche WebLink
<br />.~ '\;;0. <br /> <br />Agenda Item 9d <br />November 9, 1993 <br /> <br />2 <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />1. THAT A CONSTRUCTION FUND LOAN IN AMOUNT OF $97,500 ( 4%, 20 <br />YEARS ) BE APPROVED FOR THE MICHIGAN RIVER WCD FOR THE <br />CONSTRUCTION OF AN ADDITIONAL OUTLET ON THE MEADOW CREEK <br />DAM, and <br /> <br />2. THAT LOAN APPROVAL BE CONTINGENT UPON STATE ENGINEER <br />ACCEPTANCE OF THE PLANS AND SPECIFICATIONS FOR <br />CONSTRUCTION OF THE ADDITIONAL OUTLET. <br /> <br />ACTION TAKEN BY THE CWCB BOARD <br /> <br />On November 9, 1993 the eweB Board took the following action, which was the <br />same as the Staff recommendation: <br /> <br />1. Approved A CONSTRUCTION FUND LOAN IN AMOUNT OF $97,500 ( 4%, <br />20 YEARS) FOR THE MICHIGAN RIVER WCD FOR THE CONSTRUCTION <br />OF AN ADDITIONAL OUTLET ON THE MEADOW CREEK DAM, and <br /> <br />2. Required THAT LOAN APPROVAL BE CONTINGENT UPON STATE <br />ENGINEER ACCEPTANCE OF THE PLANS AND SPECIFICATIONS FOR <br />CONSTRUCTION OF THE ADDITIONAL OUTLET. <br /> <br />C:\wp51\9d119_cwc <br />