My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01783
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2011 3:25:36 PM
Creation date
3/8/2007 1:46:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150096
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SPL
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br /> <br />NAME <br /> <br />ADDRESS and PHONE <br /> <br />Jack Odor.engineer 219 East Railroad Ave. Fort Morqan, 80701 (970)867- <br />5298 <br /> <br />Carlson Hammond & paddor.k 1700 T.inr.oln <br /> <br />Dpnvpr RO?01 <br />. <br /> <br />Mary H~mmonn, ~rrornpy <br /> <br />(303) 8fi1-9000 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. <br /> <br />9. Estimated cost of the project. Please include estimated engmeenng costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $ 5 , 000 . 00 <br />Estimated Construction Costs: $ 90, 000 . 00 <br />Estimated Total Costs: $ 9 S . 000 00 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />Term (length) of loan: <br />Interest Rate: <br /> <br />1 0 <br />2 <br /> <br />years (Usually 10, 20, or 30 years) <br /> <br />% (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, financial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />I. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.