Laserfiche WebLink
<br />.. <br /> <br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach separate sheets if needed, and a map <br />ofthe service area. rfhe diversion structure on the South Platte <br /> <br />River at Log Lane Village..... (serving farmers along 35 miles <br />of canal) has severe erosion under and behind the control qates. <br />For existing facilities indicate: <br /> <br />Number of shareholders <br /> <br />100 <br /> <br />or Number of customers served <br /> <br />Current Assessment per share $ 6 5 . 0 0 <br />Number of acres irrigated 1 1 , 000 <br /> <br />Number of shares 1 1 87 <br /> <br />Part B. - Description of the Project <br />1. Name ofthe project or facility UPPER PLATTE & BEAVER CANAL DIVERSION REPAIR <br /> <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />X Emergency Repair <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO_ <br /> <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. MORGAN COUNTY, Northwest <br />of Fort Morqan at Loq Lane Village <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. _ <br />Will need toform and pour concrete (reinforced) under and <br /> <br />behind the existinq structure (to replace previously existinq <br /> <br />shale) to prevent reoccurance of the erosion problem. <br /> <br />Water Right: 234 CFS. <br /> <br />Average water diverted per year: 30, 000 acre- feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br /> <br />NO~ <br /> <br />2 <br />