Laserfiche WebLink
<br />CARY DITCH - RECONSTRUCTION <br />Preliminary Cost Estimate <br /> <br />tJ'l-I7,h,1 G" <br /> <br />7, February 1996 <br /> <br />ID1.it. price <br /> <br />Headqate structure <br />Concrete in place 35cy 800/cy $28000 <br />Two headgates 30" 1500/each 3000 <br />140 feet 30" 16.00/ft 2500 <br />Trash rack 900 <br />Excavation 11,200cy 4.00/cy 44800 <br />Culvert 800 feet 42" 18.50/ft 14800 <br />Rip-Rap 100 feet 5000 <br />Re-seeding 1000 <br />R.R. crossing 5000 <br />Parshall Flume 1500 <br />Engineering & surveying(SCS) N/C <br />contingency '- 8500 <br />Partial removal of rocks in temporary darn 5000 <br /> <br />TOTAL <br /> <br />Prepared By: <br /> <br />R.E. Florida, SCS <br />J.R. Fetcher, PE <br /> <br />120,000 <br />