My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01772
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:29 AM
Creation date
3/8/2007 1:45:57 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153686
Contractor Name
Red Mesa Ward Reservoir and Ditch Company
Contract Type
Grant
Water District
0
Bill Number
HB 95-1155
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i- <br /> <br />. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />April 14, 1994 <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Danes Co Lile, P.Eo <br />Director. CWCB <br /> <br />Mr. Trent Taylor <br />Board Vice Chairman <br />1290 County Road 102 <br />Hesperus, CO 81326 <br /> <br />RE: Red Mesa Ward Reservoir & Ditch Co. <br />Preliminary Loan Approval <br /> <br />Dear Mr. Taylor, <br /> <br />Concerning your application for a loan from the Construction Fund, I. am pleased to inform you <br />that the CWCB Board has granted preliminary approval of your request in amount of <br />$15,000. The CWCB Board also allowed that this loan may be rolled into the Construction Fund <br />loan for the project, or forgiven all together if it is determined that the project is not feasible. <br />It is my understanding that these funds will be used to conduct a Feasibility Study to evaluate <br />enlargement of the reservoir, and construction of a larger emergency spillway. I have attached <br />a copy of my updated CWCB Board memo concerning the Red Mesa Ward Reservoir and Ditch <br />Company. Please refer to pages 2 and 3 of that memo and to the section "Action Taken by the <br />CWCB Board". <br /> <br />Before the CWCB can provide funds for this study, a formal contract between your Company and <br />the State must be finalized. I will draft the contract within the next two weeks, and send it to you <br />for your review and approval. My experience is that it takes about two months to finalize a <br />contract, and the State controller's office insists that no work be preformed on the study <br />until the contract is final. <br /> <br />On behalf of the CWCB Board, I would like to thank you for applying for a Construction Fund <br />Loan from the Colorado Water Conservation Board. <br /> <br /> <br />cerely, <br /> <br />} . <br /> <br />1iJ;sciver, PoE. <br />Colorado Water Conservation Board <br /> <br /> <br />Attachments <br />C:\WP51\20dLtr.mar <br />
The URL can be used to link to this page
Your browser does not support the video tag.