My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01767
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
3/8/2007 1:45:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150007
Contractor Name
San Luis Valley Canal Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Cost Estimate <br /> <br />The selected alternative is estimated to cost a total of <br />$250,000. Design will be completed by NRCS staff. The <br />construction cost estimate, including contingencies, was provided <br />by the NRCS and is included in Appendix B. <br /> <br />Item <br />1. Clearing/Grubbing <br /> <br />Estimated Cost <br />$ 3,500.00 <br /> <br />2. Removal of Water <br /> <br />16,700.00 <br /> <br />3. Earth Fill, 500 cy <br /> <br />16,700.00 <br /> <br />4. Reinforced concrete, 100 cy <br /> <br />117,900.00 <br /> <br />5. Removal of Existing Structure <br /> <br />25,000.00 <br /> <br />6. Rock Rip Rap, 100 cy <br /> <br />3,500.00 <br /> <br />7. Radial Gate, 20.0. x 3.0', 1 each <br /> <br />66,700.00 <br /> <br />$250,000.00 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Bid the Job <br />4. Award the Bid <br />5. Start Construction <br />6. Complete Construction <br />7. Project is Operational <br /> <br />Tarqet Completion Date <br />5/1/97 <br />6/1/97 <br />6/15/97 <br />6/30/97 <br />7/1/97 <br />9/30/97 <br />10/1/97 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact providing <br />irrigation water for 11,000 acres of shareholders' crops. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The new structure will be very similar <br />to the previous structure. <br /> <br />The Project will provide SLVCC with control of water entering the <br />SLVC during periods of high water (above flood stage) on the Rio <br />Grande River. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.