<br />Cost Estimate <br /> <br />The selected alternative is estimated to cost a total of <br />$250,000. Design will be completed by NRCS staff. The <br />construction cost estimate, including contingencies, was provided <br />by the NRCS and is included in Appendix B. <br /> <br />Item <br />1. Clearing/Grubbing <br /> <br />Estimated Cost <br />$ 3,500.00 <br /> <br />2. Removal of Water <br /> <br />16,700.00 <br /> <br />3. Earth Fill, 500 cy <br /> <br />16,700.00 <br /> <br />4. Reinforced concrete, 100 cy <br /> <br />117,900.00 <br /> <br />5. Removal of Existing Structure <br /> <br />25,000.00 <br /> <br />6. Rock Rip Rap, 100 cy <br /> <br />3,500.00 <br /> <br />7. Radial Gate, 20.0. x 3.0', 1 each <br /> <br />66,700.00 <br /> <br />$250,000.00 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Bid the Job <br />4. Award the Bid <br />5. Start Construction <br />6. Complete Construction <br />7. Project is Operational <br /> <br />Tarqet Completion Date <br />5/1/97 <br />6/1/97 <br />6/15/97 <br />6/30/97 <br />7/1/97 <br />9/30/97 <br />10/1/97 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact providing <br />irrigation water for 11,000 acres of shareholders' crops. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The new structure will be very similar <br />to the previous structure. <br /> <br />The Project will provide SLVCC with control of water entering the <br />SLVC during periods of high water (above flood stage) on the Rio <br />Grande River. <br /> <br />4 <br />