Laserfiche WebLink
<br />-<- <br /> <br />.. <br /> <br />IV. STAFF REQUIREMENTS <br /> <br /> Duration <br />Task (days) Start Date End Date Lead Person <br />Finish Planning: 5 8/01/03 9/01/03 Gallegos <br />Design Hydrology: 1 8/01/03 9/01/03 Gallegos <br />Design Survey: 2 8/01 /03 8/30/03 Gallegos <br />Preliminary Design: 2 7/01/03 8/01/03 Gallegos <br />Drawings and Specs: 7 9/01/03 9/15/03 Clark/Gallegos <br />Design Review: 1 9/25/03 9/30/03 Clark/Gallegos <br />Final Drawings and Specs: 2 9/30/03 10/01/03 Clark/Gallegos <br />Design Approval: 14 10/05/03 10/20/03 Andrews <br />Permits and Easements: 1 8/01 /03 9/01/03 Faucette <br />Land Rights Acquisition: 1 8/01/03 9/01/03 Faucette <br />Project Agreement: 3 8/01/03 9/01/03 Braiden <br />Award Contract: 1 10/25/03 1 0/30/03 Braiden <br />Construction Inspection: 10 10/30/03 5/01/04 Clark/Gallegos <br />Final Inspection: 1 5/01/04 5/01/04 Clark/Gallegos <br />As Built Drawings: 2 5/10/04 5/15/04 Clark/Gallegos <br />Total Time: 43days Estimated <br /> Completion <br /> Date: 5/20/04 <br /> <br />V. TECHNICAL CONCURRENCE AND ADMINISTRATIVE APPROVAL <br /> <br />A. Technical Concurrence <br /> <br />The information in this report is accurate, the <br />proposed project will accomplish the client's <br />objectives, the proposed design requirements are <br />adequate for the level of complexity associated with <br />this job, and staffing requirements represent the <br />amount of NRCS staff time needed to plan, design and <br />construct this project. <br /> <br />Prepared by: <br /> <br />Concurred: <br /> <br />Signature <br /> <br />State Conservation Engineer <br /> <br />Title <br /> <br />9 <br />