My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01762
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01762
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
3/8/2007 1:45:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0040X
Contractor Name
El Viejo Ditch
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Geotechincal analysis of the soils is not <br />needed. A granular, select backfill material <br />will be used for the all the pipe. It is <br />anticipated that this material will have to <br />come from separating of the trench materials <br />during the trench excavation. <br />4. Structural design requirements will be <br />needed for a trash cleaning device, water <br />measurement, and divider of decreed flows <br />for the pipeline. Divider box, measuring <br />staffs, check and turnout boxes and trash <br />racks will be used. <br />5. Environmentally speaking, this project is <br />very benign. Some upland type vegetation <br />will be destroyed when the supply ditch is <br />replaced with a pipeline but the extent of <br />the existing vegetation is very low. <br />6. Construction drawings will consist of a Plan <br />and Profile view of the pipeline and another <br />section for appurtenance details. Elevations <br />and grades critical to function of the <br />pipeline will be shown. <br />7. Construction specifications include in the <br />Colorado Standards and Specifications <br />Technical Guides will be used. <br />8. Construction inspection will be conducted <br />during installation of all pipes in order to <br />check backfill and grade requirements. <br />Follow-up inspection of the pipe <br />installation will be done on an as needed <br />basis. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.