Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br /> <br />severance tax trust fund perpetual base account. (1) Pursuant to <br /> <br />2 <br />3 <br />4 <br />5 <br /> <br />section 39-29-109 (1) (a) (I), Colorado Revised Statutes, the Colorado <br /> <br />water conservation board is hereby authorized to loan moneys from the <br /> <br /> <br />severance tax trust fund perpetual base account to enable the construction <br /> <br />of the following water resources projects with the following priority: <br /> <br />Priority <br /> <br />Borrower - Project <br />Central Colorado Water <br /> <br />Loan Amount <br /> <br />(a) <br /> <br />Conservancy District Well <br /> <br />Augmentation Sub-district - Water <br />Rights Purchase and Construction of <br />Lined Gravel Pit Water Storage* <br /> <br />AND GROUNDWATER RECHARGE <br /> <br />PROJECTS <br />Total <br /> <br />$20,200,000 <br />$20,200,000 <br /> <br />15 * This loan is to refinance projects wholly or partially completed <br />16 (2) The Colorado water conservation board may make loans for <br />17 the construction ofthe pIUj~d PROJECTS specified in subsection (1) ofthis <br /> <br />18 section from such moneys as are or may hereafter become available to the <br /> <br />19 severance tax trust fund perpetual base account. Tll~ luau SAID LOANS <br />20 shall be in the awuuul AMOUNTS listed in subsection (1) of this section <br />21 plus or minus such amounts, if any, as may be justified by reason of <br />22 ordinary fluctuations in construction costs as indicated by the engineering <br /> <br />23 cost indices applicable to the types of construction required for tire EACH <br />24 project or as may be justified by reason of changes in the plans for a <br /> <br />25 project due to differing or unforeseen site conditions, errors or omissions <br /> <br />26 in the plans and specifications, changes instituted by regulatory agencies, <br /> <br />. <br /> <br />27 <br /> <br />or changes in material quantities beyond contract limits. <br /> <br />-20- <br /> <br />DRAFT <br /> <br />DRAFT <br />12.15.06 <br />