My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00106 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00106 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:50 PM
Creation date
3/7/2007 11:07:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2007
Description
CF Section - New Loans - Wood Lake Mutual Water and Irrigation Co. - Angel Lake Outlet Repair
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />City of Aurora <br />January 23-24, 2007 <br />Page 5 of 7 <br /> <br />Agenda Item 9f <br /> <br />Pipeline Segment 3 Alignment - Land use along the 8.8-mile Segment 3 corridor from the PS-3 site <br />to the South Campus is mostly undeveloped with some adjacent dry land agriculture. Portions of <br />the pipeline alignment are within the City municipal limits and portions are outside, in Arapahoe <br />County. Overhead power lines and buried fiber-optic lines must be crossed, but do not pose <br />significant construction conflicts. <br /> <br />Cost Estimate - Estimates for the Conveyance System components are: <br /> <br />CONSTRUCTION COST ESTIMATE <br />Bid Package E - Pumping Stations 1, 2 and 3 <br />Bid Package G - Conveyance Pipeline Segment 1 <br />Bid Package H - Conveyance Pipeline Segment 2 <br />Bid Package I - Conveyance Pipeline Segment 3 <br />Total <br /> <br />Cost Estimate <br />$63,000,000 <br />$79,000,000 <br />$65,000,000 <br />$43,000,000 <br />$250,000,000 <br /> <br />Implementation Schedule - The baseline schedule for construction of the Conveyance System bid <br />packages: <br /> <br /> <br /> <br />F M A M <br /> <br />Pkg. I Conveyance Pipeline #3 <br /> <br />12.Sep-07 I <br /> <br />I 29.Jan-09 <br /> <br />Pkg. G Conveyance Pipeline #1 <br /> <br />, 1S.Ma,.10 <br /> <br />19-Ma,-oS I <br /> <br />Pkg. H Conveyance Pipeline #2 <br /> <br />, 03-May-10 <br /> <br />07.May-oS , <br /> <br />Pkg. E Pumping Stations 1, 2 & 3 <br /> <br />I <br />29-0cl.10 <br /> <br />13-Jun-oS ' <br /> <br />Bid Packages E, G, H, and I are currently in design. Design activities are nearing completion. The <br />bidding process will begin for the first bid package in mid-2007. Construction is expected to begin <br />on Segment 3 in September 2007. Construction of the other pipelines and pumping stations is <br />expected to begin mid-2008. <br /> <br />The CWCB Design and Construction Manager will review and field check construction progress <br />throughout the duration of the Conveyance System installation. The actual cost of the Conveyance <br />System may vary (increase or decrease) from the engineer's estimated cost of $250 million. It is the <br />Intent of the staff recommendation that Aurora receive the full $75 million loan. In order to <br />accomplish this, CWCB Design and Construction Manager shall disburse loan funds at a rate of <br />50% of submitted project invoices. This will ensure that full funding of the $75 million will be met. At <br />no time shall the CWCB Financial Policy controlling the funding limit of 90% of total project cost be <br />exceeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.