My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00097 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00097 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:41 PM
Creation date
3/7/2007 11:07:15 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2007
Description
Draft Summary Minutes and Record of Decisions - November 13-15, 2006
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />to the loan to the Enterprise and the step-up provisions of the participants' <br />agreements; <br />(7) Federal Memorandum of Understanding (MOU) It is contemplated that <br />an MOD between the SECWCD Water Activity Enterprise and a federal agency or <br />agencies will be necessary to address such items as design, ownership and operation <br />of the Arkansas Valley Conduit. This agreement shall be in place prior to execution <br />of a State contract; <br />(8) Status Report on Conditions - Prior to executing a State loan contract, <br />the CWCB staff shall provide a status report to the Board on the fulfillment ofthe <br />above loan approval conditions; <br />(9) Loan Disbursements - Disbursements from the CWCB to the Enterprise <br />will be in the same percentage (and time frame) relative to the total CWCB loan <br />amount, as disbursements made from the federal government relative to the total <br />federal government cost-share commitment. <br /> <br />Harold Miskel recused himself from the vote. The motion was approved <br />unanimously (8-0). <br /> <br />. <br /> <br />lOb. Water Supply Planning and Finance - Construction Fund and Severance Tax Trust <br />Fund Perpetual Base Account New Loans - Lazy-a-Ranch - Dual Water Supply <br />System <br />Tape 1, Track 2 01:25:35-01:38:18 <br />Action: A motion was made by Barbara Biggs and seconded by Don Schwindt to approve a <br />loan from the Construction Fund in the amount up to $152,258 ($150,750 for <br />project costs and $1,508 for the 1% loan origination fee, in accordance with CWCB <br />Financial Policy No. 16) to the Lazy 0 Ranch Homeowners Association. The loan <br />is for up to 90% of the cost to construct a secondary water supply system. The <br />recommended loan tenns are 30-years at 4.25%. Security for the loan will be a <br />pledge of assessment revenues backed by assessment covenant and the project itself <br />in accordance with Policy No.5. The final approval of the loan shall be conditioned <br />upon all standard-contracting provisions of the CWCB. The motion was approved <br />unanimously (9-0). <br /> <br />lOco Water Supply Planning and Finance - Construction Fund and Severance Tax: Trust <br />Fund Perpetual Base Account New Loans - Penrose Water District - Water Rights <br />Purchase and Raw Water Pipeline Project <br />Tape 1, Track 2 02:42:44 - 03:03:09 <br />Action: A motion was made by Harold Miskel and seconded by Tom Sharp to approve a <br />loan not to exceed $8,844,570 ($8,757,000 for project costs and $87,570 for the 1% <br />Loan Service Fee in accordance with the CWCB Loan Policy #16), to the Penrose <br />Water District, acting by and through the Penrose Water District Water Activity <br />Enterprise, from the Severance Tax Trust Fund Perpetual Base Account, to purchase <br />water rights and construct a raw water pipeline from the Arkansas River to the <br />District's service area, enlarge Brush Hollow Reservoir, and to cover expenses <br />already incurred. The tenns of the loan are 30 years at 3.25% per annum. As <br />security for the loan the Penrose Water District Water Activity Enterprise, will <br />pledge water user revenues backed by a rate covenant, revenues from the 3.00 mill <br />Special Revenue Fund levy, and annual financial reporting. The fmal approval of <br />the loan shall be conditioned upon all other standard contracting provisions of the <br /> <br />. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.