Project Cost Estimate for Design and Construction <br /> <br /> -- <br />Item and Description Quantity Unit Unit Cost Total <br /> -- <br />I - Remove Structure - Deer Creek Box Culverts including 1 EA $25,000.00 $25,000 <br />embankment, headwalls, and guardrails -- <br />2 - Remove Pipe - Existing Drainage Culverts (5 assumed) 1 LS $5,000.00 $5,000 <br /> -- <br />3 - Remove Asphalt Mat from existing roadway 48,300 SY $4.50 $217,350 <br /> -- <br />4 - Remove Existing Bridges at Platte River and southeast 2 EA $15,000.00 $30,000 <br />comer of existing reservoir -- <br />5 - Obliterate Old Roadway (Assumes approx.14,000 LF @ 37,600 CY $7.00 $263,200 <br />24" depth) -- <br />6 - Unclassified Excavation (complete in place) 74,400 CY $7.50 $558,000 <br /> -- <br />7 - Rock Fill for soft area stabilization (12" depth over 20% of 11,500 CY $17.00 $195,500 <br />roadway length) <br />8 - Topsoil Removal and Replacement 17,630 CY $6.00 $105,780 -- <br />9 - Seeding (native) (assumes 20' on both sides of new 34 AC $900.00 $30,600 <br />roadway and restoration of approx. 11,500 LF of existing <br />roadway) -- <br />10 - Mulching (weed free hay) 34 AC $600.00 $20,400 <br /> -- <br />II - Aggregate Base Course (CL 6) (12" depth) 23,870 CY $18.00 $429,660 <br />12 - Hot Bituminous Pavement (6" depth) 24,185 TN $38.00 $919,030 <br /> -- <br />13 - Riprap (assumes 15' coverage at each drainage structure) 230 CY $48.00 $11,040 -- <br />14 - 24 Inch Diameter RCP 840 LF $60.00 $50,400 <br /> -- <br />15 - 36 Inch Diameter RCP 70 LF $72.00 $5,040 <br />16 - 48 Inch Diameter RCP 350 LF $125.00 $.43,750 <br />17 - 24 Inch Reinforced Concrete End Section 24 EA $600.00 $14,400 <br /> -- <br />18 - 36 Inch Reinforced Concrete End Section 2 EA $850.00 $1,700 <br /> -- <br />19 - 48 Inch Reinforced Concrete End Section 10 EA $1 ,OOO.~O $10,000 <br />20 - Double 10' x 6' Concrete Box Culvert (complete in place) 5 EA $80,000.00 $400,000 <br /> -- <br />21 - 42' x 72.5' Bridge at Deer Creek Crossing 1 LS $168,000.00 $168,000 <br />22 - 42' x 200' Bridge at Platte River Crossing 1 LS $504,000.00 $504,000 <br />23 - Delineators 100 EA $20.00 $2,000 <br /> -- <br />24 - Miscellaneous Si.e:nage 1 LS $10,000.00 $10,000 <br /> -- <br />25 - Erosion Control 1 LS $75,000.00 $75,000 <br /> -- <br />26 - Environmental Miti.e:ation (wetland/habitat restoration) 1 LS $50,000.00 $50,000 <br /> -- <br />27 - Pavement Marking Paint 600 GAL $38.00 $22,800 <br /> -- <br />Subtotal $4,167,650 <br /> -- <br />Contingency (20%) $833,530 <br /> -- <br />Total Estimated Construction Cost $5,001,180 <br />Professional Design Services (8% of construction) $400,094 -- <br />Construction Phase Services (6% of construction) $300,071 -- <br />TOTAL ESTIMATED PROJECT COST $5,701,345 <br />