My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10318
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:08 AM
Creation date
2/27/2007 8:17:21 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Jefferson
Stream Name
South Platte River
Basin
South Platte
Title
Chatfield Reservoir, Roadway Analysis Study
Date
2/3/2004
Prepared For
CWCB
Prepared By
Sear Brown
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7. The unit costs for the opinion of probable construction cost were obtained by comparing <br />recent bids of current roadway construction projects located in the Front Range. The <br />costs were from publicly bid projects and are adjusted based on engineer's judgment <br />where appropriate to be consistent with the level of work expected for this project. <br /> <br />Investigations <br />On December 19, 2003, a site visit was held with EDA W, CWCB, Sear-Brown, and CTL <br />Thompson to make a visual observation of the existing soil conditions along the proposed <br />alignment. Mr. Frank Holliday, CTL Thompson, was selected to perform this review and <br />provide his conceptual level recommendations based on his knowledge of and experience <br />with the soils in this part of the Denver area. Mr. Holliday made a visual reconnaissance of <br />the types of soils present along the proposed roadway alignment to attempt to identify areas <br />of potential concern that may impact the feasibility or cost of constructing a roadway along <br />the alignment. Mr. Holliday's observations generally indicate that the soils northerly of the <br />Deer Creek crossing appear to be clay over claystone bedrock which are expansive type <br />soils. For the roadway southerly of Deer Creek appear to be a variable thickness of clays <br />overlying alluvial sands and gravels mixed with some cobbles and probably boulders. Mr. <br />Holliday provided some possible methods to deal with potential construction issues but did <br />not observe any geologic or geotechnical conditions that would preclude building the <br />roadway in the proposed alignment on the conceptual plan. For the complete text of CTL <br />Thompson's observations, refer to the letter dated January 6, 2004 from CTL Thompson to <br />Sear-Brown. <br /> <br />Route Selection <br />. <br />In the original concept plan there were two possible roadway alignments that were reviewed <br />by the design team. Both alignments were identical along the west side of the existing <br />reservoir to the point where the current roadway turns easterly around the southern side of <br />the reservoir towards the Platte River crossing. At this point one option was to use this <br />existing alignment and significantly raise the roadway above the new water elevation and <br />effectively creating a causeway across the south end of the reservoir including a new bridge <br />crossing of the Platte River. The second option was to construct a new roadway around the <br />south end of the what would be the new reservoir water levels and make a new crossing of <br />the Platte River. Both of these alignments were reviewed with State Parks and the design <br />team and it was decided by State parks that for operational concerns it would be preferable <br />to construct a new roadway around the south end of the expanded reservoir rather than to <br />build a causeway across it. To that end, a conceptual level design and cost estimate was <br />completed for only the option of extending a new roadway around the south end of the <br />expanded lake. The selected route would be a new roadway approximately 4.1 miles in <br />length including two new bridges. <br />
The URL can be used to link to this page
Your browser does not support the video tag.